Crown Solutions contracted for water treatment plant

This system will be installed at the world's largest thermal solar power plant, located in Gila Bend, Arizona and operated by Abengoa Solar. The plant consists of two 140 MW steam generator/turbine/generator units supplied with heat from a 1,800 acre Solar Collector Field. It also features a large thermal storage system that allows it to continue to generate power for up to six hours after sundown. Crown Solutions’ water treatment process consists of a 4,500 GPM integrated well water and wastewater recovery system. The overall system recovery will be over 95%.