Kruger upgrades Rhode Island wastewater plant with ACTIFLO

The installation will feature two 12.5 MGD Veolia designed process treatment trains complete with controls, mixers, chemical and microsand feed equipment for a total design capacity of 25 MGD. The system will treat secondary effluent with total phosphorus as high as 1.5 mg/L down to an effluent limit of < 0.10 mg/L.