Related Links

  • Aqualyng
  • Elsevier Ltd is not responsible for the content of external websites.

Related Stories

  • SWRO pre-treatment: Markets and experience
    In the fourth of a series of articles, Graeme Pearce looks at the issues involved in the selection of pre-treatment in seawater reverse osmosis desalination applications.
    Members' Content
  • Conventional and membrane filtration: Selecting a SWRO pre-treatment system
    Seawater pre-treatment is an integral part of every seawater reverse osmosis (SWRO) desalination plant, used to remove particulates, debris, micro-organisms, suspended solids and silt from the source seawater. But with conventional and membrane filtration to choose from, which is right for you? Nicolay Voutchkov compares the two options.
  • SWRO pre-treatment: Treated water quality
    In the first of a series of articles, Graeme Pearce looks at the issues involved in the selection of pre-treatment technology in seawater reverse osmosis applications.
  • Beating the drought with low-pressure membranes
    Despite extreme drought conditions and a rapidly growing population, the Western Australia city of Perth is getting water to its residents due to a groundbreaking desalination plant which uses low-pressure membranes and renewable energy to achieve its results.
  • Portable tech for offshore locations
    In this article, Anthony Bennett investigates the application of small scale desalination technologies for remote commercial, industrial, military, naval, marine and offshore applications. He examines the thermal and membrane technologies available and the sizes of equipment employed from portable systems to larger containerized or skid/frame mounted plant.
    Members' Content

News

Aqualyng begins construction of Caofeidian SWRO desalination project

23 April 2010

Having signed definitive agreements on a build, own, operate and transfer basis, Aqualyng has begun the construction phase of the 50,000 m³/day seawater reverse osmosis desalination plant

Aqualyng, in conjunction with joint venture partner the Tangshan Caofeidian Infrastructure Construction Investment Co (IIC), has directed the construction phase to begin. The SWRO desalination plant will serve the water needs of the Caofeidian Industrial Zone in China and is the first phase of an expected total of up to 300 000 m3/day over the coming years. Aqualyng will operate the plant during the 30 year term of the offtake agreement.
 

The plant will be built by the Hangzhou Development Centre of Water Treatment Technology Co (HZWT), and is expected to be completed during September 2011. Aqualyng will be supplying its patented proprietary energy recovery device, the Recuperator, to the plant. The total investment for the project is approximately $65 million.
 

Brynjulf Lomsdalen,CEO of Aqualyng Holding, said: “This project is a breakthrough for Aqualyng. The Chinese market for desalination, one of the fastest growing in the world, has proven difficult for foreign companies to enter. It’s a source of pride that Aqualyng has been able to develop this project based on a contractual framework that we believe can serve as a model for future projects in China.”
 

 

This article is featured in:
Desalination

 

Comment on this article

You must be registered and logged in to leave a comment about this article.